Operator Balance Power Projects Limited · Owner Balance Energy 11 LTD

Awaiting Construction99 MWData checked 16 November 2026Source record dated 6 September 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Iron Acton Substation, Latteridge Lane - Battery Energy Storage System is a 99 MW battery storage site 5.1 km south-east of Thornbury, Gloucestershire, United Kingdom. Its planning application (P23/02405/F) went to South Gloucestershire on 21 August 2023 and was granted on 16 August 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 74 other energy sites within 10 km, 25 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Iron Acton Substation, Latteridge Lane - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire42 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter115 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells196 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
99 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Balance Power Projects Limited
Owner
Balance Energy 11 LTD
Location
West Of Iron Acton Substation Latteridge Lane Iron Acton, Gloucestershire, BS35 3TF, United Kingdom
Planning authority
South Gloucestershire
Planning application
P23/02405/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P23/02405/F, with what the planning evidence pack adds for this site.

Every application in South Gloucestershire · Alerts for applications and incidents near here

  • 21 August 2023 Planning application submitted
  • 16 August 2024 Planning permission granted
  • 16 August 2027 Planning permission runs out

None found. The register holds no published incident that names Iron Acton Substation, Latteridge Lane - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Iron Acton Substation, Latteridge Lane - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Iron Acton Substation, Latteridge Lane - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Iron Acton Substation, Latteridge Lane - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 September 2024.
Where is Iron Acton Substation, Latteridge Lane - Battery Energy Storage System?
5.1 km south-east of Thornbury, Gloucestershire, United Kingdom (postcode BS35 3TF).