Planning pack for this site, £295Other options

Battery storage · United Kingdom

Lower Larks Farm - Battery storage

Operator IPP Cero Generation · Owner HD000ACT Ltd

Awaiting Construction99.9 MWData checked 16 November 2026Source record dated 15 June 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Lower Larks Farm - Battery storage is a 99.9 MW battery storage site 5.2 km south-east of Thornbury, Gloucestershire, United Kingdom. Its planning application (P22/03743/F) went to South Gloucestershire on 20 July 2022 and was granted on 14 April 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 70 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

HD000ACT LTD (12023670), active, since 2019. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lower Larks Farm - Battery storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire41 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter116 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells196 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
99.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
IPP Cero Generation
Owner
HD000ACT Ltd
Location
Lower Larks Farm Larks Lane Iron Acton, Gloucestershire, BS37 9TX, United Kingdom
Planning authority
South Gloucestershire
Planning application
P22/03743/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P22/03743/F, with what the planning evidence pack adds for this site.

Every application in South Gloucestershire · Alerts for applications and incidents near here

  • 20 July 2022 Planning application submitted
  • 14 April 2023 Planning permission granted
  • 14 April 2026 Planning permission expired

None found. The register holds no published incident that names Lower Larks Farm - Battery storage. If you know of one, report it (confidential reports are anonymised).

Has Lower Larks Farm - Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lower Larks Farm - Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lower Larks Farm - Battery storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2023.
Where is Lower Larks Farm - Battery storage?
5.2 km south-east of Thornbury, Gloucestershire, United Kingdom (postcode BS37 9TX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).