Planning pack for this site, £295Other options

Battery storage · United Kingdom

Draycott Cross Road - Battery Storage System

Operator Balance Power Projects Limited · Owner Balance Energy 8 LTD

Awaiting Construction40 MWData checked 16 November 2026Source record dated 12 January 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Draycott Cross Road - Battery Storage System is a 40 MW battery storage site on the edge of Cheadle, Staffordshire, United Kingdom. Its planning application (SMD/2023/0263) went to Staffordshire Moorlands on 20 June 2023 and was granted on 5 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Draycott Cross Road - Battery Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 62 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells62 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool76 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire141 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Balance Power Projects Limited
Owner
Balance Energy 8 LTD
Location
Draycott Cross Road, Stoke on Trent, Staffordshire, ST10 1PN, United Kingdom
Planning authority
Staffordshire Moorlands
Planning application
SMD/2023/0263

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SMD/2023/0263, with what the planning evidence pack adds for this site.

Every application in Staffordshire Moorlands · Alerts for applications and incidents near here

  • 20 June 2023 Planning application submitted
  • 5 January 2024 Planning permission granted
  • 5 January 2027 Planning permission runs out

None found. The register holds no published incident that names Draycott Cross Road - Battery Storage System. If you know of one, report it (confidential reports are anonymised).

Has Draycott Cross Road - Battery Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Draycott Cross Road - Battery Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Draycott Cross Road - Battery Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2024.
Where is Draycott Cross Road - Battery Storage System?
On the edge of Cheadle, Staffordshire, United Kingdom (postcode ST10 1PN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).