← Back to Bedfordshire

Solar · United Kingdom

Langford Solar Farm

Operator Lark Energy · Owner Kingfisher Ventures Limited

Operational13 MWData checked 16 November 2026Source record dated 15 April 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Langford Solar Farm is a 13 MW solar farm on the edge of Henlow, Bedfordshire, United Kingdom. Its planning application (CB/13/02288/FULL) went to Central Bedfordshire on 28 June 2013 and was granted on 24 September 2013. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 32 other sites and 604 energy sites within 40 km for Langford Solar Farm

Members see the sites and incidents around this one, and every record behind them.

21 Oct20 Nov
Quick Reserve

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

A day out costs this site about £82 at its earnings over the last 29 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

LARK ENERGY LIMITED (10760734), dissolved, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
13 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lark Energy
Owner
Kingfisher Ventures Limited
Location
Edworth Road, Biggleswade, Bedfordshire, Bedfordshire, SG18 9PJ, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/13/02288/FULL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/13/02288/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 28 June 2013 Planning application submitted
  • 24 September 2013 Planning permission granted
  • 1 June 2014 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Langford Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Langford Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Langford Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Langford Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 April 2015.
Where is Langford Solar Farm?
On the edge of Henlow, Bedfordshire, United Kingdom (postcode SG18 9PJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).