Battery storage · United Kingdom

Native River

Operator Varco Energy · Owner Native River LTD

Operational57 MWData checked 16 November 2026Source record dated 28 April 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Native River is a 57 MW battery storage site 3.4 km south-west of Ellesmere Port Town, Cheshire, United Kingdom. Its planning application (20/04767/FUL) went to Cheshire West and Chester on 17 December 2020 and was granted on 16 April 2021. It has been operating since 14 April 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 58 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

474 energy sites within 40 km for Native River

Members see the sites and incidents around this one, and every record behind them.

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Battery storage (Stand-alone Storage)
Capacity
57 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Varco Energy
Owner
Native River LTD
Location
Adj Electricity Substation, Cheshire, CH66 2HD, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
20/04767/FUL
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/04767/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 17 December 2020 Planning application submitted
  • 16 April 2021 Planning permission granted
  • 1 July 2023 Construction started
  • 14 April 2025 Operational

None found. The register holds no published incident that names Native River. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Native River had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Native River; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Native River?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 April 2025.
Where is Native River?
3.4 km south-west of Ellesmere Port Town, Cheshire, United Kingdom (postcode CH66 2HD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).