Battery storage · United Kingdom
Rectory Lane - Energy Storage System
Operator Net Zero Eighteen Limited
Awaiting Construction200 MWData checked 16 November 2026Source record dated 18 June 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Rectory Lane - Energy Storage System is a 200 MW battery storage site 4.6 km south-west of Ellesmere Port Town, Cheshire, United Kingdom. Its planning application (24/02219/FUL) went to Cheshire West and Chester on 27 August 2024 and was granted on 19 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 54 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Rectory Lane - Energy Storage System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rectory Lane - Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 15 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 15 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 124 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 186 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 200 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Net Zero Eighteen Limited
- Location
- Rectory Lane, Capenhurst, South Wirral, Cheshire, CH66 0NG, United Kingdom
- Planning authority
- Cheshire West and Chester
- Planning application
- 24/02219/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/02219/FUL, with what the planning evidence pack adds for this site.
Every application in Cheshire West and Chester · Alerts for applications and incidents near here
Timeline
- 27 August 2024 Planning application submitted
- 19 May 2025 Planning permission granted
- 19 May 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Rectory Lane - Energy Storage System. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Rectory Lane - Energy Storage System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rectory Lane - Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Rectory Lane - Energy Storage System?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 June 2025.
- Where is Rectory Lane - Energy Storage System?
- 4.6 km south-west of Ellesmere Port Town, Cheshire, United Kingdom (postcode CH66 0NG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).