← Back to Cheshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Capenhurst Lane, Capenhurst - Battery Storage

Operator Aura Power BESS Limited · Owner Aura Power BESS LTD

Awaiting Construction100 MWData checked 16 November 2026Source record dated 13 December 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Capenhurst Lane, Capenhurst - Battery Storage is a 100 MW battery storage site 3.4 km south-west of Ellesmere Port Town, Cheshire, United Kingdom. Its planning application (22/03585/FUL) went to Cheshire West and Chester on 22 September 2022 and was granted on 8 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Capenhurst Lane, Capenhurst - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 15 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool15 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells122 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire185 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
100 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Aura Power BESS Limited
Owner
Aura Power BESS LTD
Location
South of Capenhurst Lane Capenhurst, Cheshire, CH66 2NT, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
22/03585/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/03585/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 22 September 2022 Planning application submitted
  • 8 December 2023 Planning permission granted
  • 8 December 2026 Planning permission runs out

None found. The register holds no published incident that names Capenhurst Lane, Capenhurst - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Capenhurst Lane, Capenhurst - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Capenhurst Lane, Capenhurst - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Capenhurst Lane, Capenhurst - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 December 2023.
Where is Capenhurst Lane, Capenhurst - Battery Storage?
3.4 km south-west of Ellesmere Port Town, Cheshire, United Kingdom (postcode CH66 2NT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).