MRG Goody Solar Project Hybrid is a 171 MW solar farm 7.2 km west of Paris, Lamar County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 4 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when MRG Goody Solar Project Hybrid changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for MRG Goody Solar Project Hybrid sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1271, Large fire reported at solar farm south of Blossom, 23 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1271 | 2022 | Large fire reported at solar farm south of Blossom | 23 km | Significant |
| EIR-1500 | 2025 | Rooftop solar panels catch fire on a home in Franklin County | 62 km | Minor |
| EIR-1410 | 2022 | Solar panels catch fire on Bank of America building roof in Plano | 121 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 171 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Nexus Renewable Power, LLC
- Owner
- Nexus Renewable Power, LLC
- Location
- Lamar County, Texas, United States
- Expected
- 2026
- Balancing authority
- ERCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names MRG Goody Solar Project Hybrid. If you know of one, report it (confidential reports are anonymised).
Questions
- Has MRG Goody Solar Project Hybrid had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names MRG Goody Solar Project Hybrid; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of MRG Goody Solar Project Hybrid?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is MRG Goody Solar Project Hybrid?
- 7.2 km west of Paris, Lamar County, Texas, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).