← Back to Texas
Planning pack for this site, £295Other options

Battery storage · United States

MRG Goody Solar Project Hybrid

Operator Nexus Renewable Power, LLC

Under construction50.4 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

MRG Goody Solar Project Hybrid is a 50.4 MW battery storage site 7.2 km west of Paris, Lamar County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for MRG Goody Solar Project Hybrid sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-1652, Small fire contained at Terra-Gen battery storage in Valley Center, 492 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16522026Small fire contained at Terra-Gen battery storage in Valley Center492 kmMinor
EIR-12272026Firefighters respond to a battery storage fire in Mission, Texas865 kmSignificant
EIR-06402016Lithium-ion battery fire during assembly at S&C Electric Franklin Facility1222 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
50.4 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Nexus Renewable Power, LLC
Owner
Nexus Renewable Power, LLC
Location
Lamar County, Texas, United States
Expected
2026
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names MRG Goody Solar Project Hybrid. If you know of one, report it (confidential reports are anonymised).

Has MRG Goody Solar Project Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names MRG Goody Solar Project Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of MRG Goody Solar Project Hybrid?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is MRG Goody Solar Project Hybrid?
7.2 km west of Paris, Lamar County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).