Solar · United Kingdom

Mount Pleasant Farm - Solar Farm

Operator Belltown Power Limited

Application Submitted35 MWData checked 16 November 2026Source record dated 25 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mount Pleasant Farm - Solar Farm is a 35 MW solar farm 6.6 km east of Swindon, Wiltshire, United Kingdom. Its planning application (S/25/0666) went to Swindon on 4 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 47 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BELLTOWN POWER UK LIMITED (09677724), active, since 2015. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mount Pleasant Farm - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire24 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries26 kmMajor
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing55 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
35 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Belltown Power Limited
Location
Mount Pleasant Farm, Mount Pleasant Farm Lane, Horpit, Swindon, Wiltshire, SN4 0AU, United Kingdom
Planning authority
Swindon
Planning application
S/25/0666

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/25/0666, with what the planning evidence pack adds for this site.

Every application in Swindon · Alerts for applications and incidents near here

  • 4 June 2025 Planning application submitted

None found. The register holds no published incident that names Mount Pleasant Farm - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Mount Pleasant Farm - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mount Pleasant Farm - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mount Pleasant Farm - Solar Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2025.
Where is Mount Pleasant Farm - Solar Farm?
6.6 km east of Swindon, Wiltshire, United Kingdom (postcode SN4 0AU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).