Solar · United Kingdom

Keypoint, South Marston - Solar panels

Operator Logicor

Awaiting Construction1.1 MWData checked 16 November 2026Source record dated 26 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Keypoint, South Marston - Solar panels is a 1.1 MW solar farm 4.8 km south of Highworth, Wiltshire, United Kingdom. Its planning application (S/23/0893) went to Swindon on 14 September 2023 and was granted on 17 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 57 other energy sites within 10 km, 38 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

LOGICOR LTD (05576366), dissolved, since 2005. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Keypoint, South Marston - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire20 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries22 kmMajor
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing59 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Logicor
Location
Keypoint, Unit 1, Thornhill Road, South Marston, Swindon, Wiltshire, SN3 4RY, United Kingdom
Planning authority
Swindon
Planning application
S/23/0893

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/23/0893, with what the planning evidence pack adds for this site.

Every application in Swindon · Alerts for applications and incidents near here

  • 14 September 2023 Planning application submitted
  • 17 January 2024 Planning permission granted
  • 17 January 2027 Planning permission runs out

None found. The register holds no published incident that names Keypoint, South Marston - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Keypoint, South Marston - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Keypoint, South Marston - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Keypoint, South Marston - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 September 2023.
Where is Keypoint, South Marston - Solar panels?
4.8 km south of Highworth, Wiltshire, United Kingdom (postcode SN3 4RY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).