Planning pack for this site, £295Other options

Solar · United Kingdom

Clipper Logistics, Shepcote Lane - Solar Panels

Operator Logicor

Awaiting Construction1.1 MWData checked 16 November 2026Source record dated 12 January 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Clipper Logistics, Shepcote Lane - Solar Panels is a 1.1 MW solar farm 3.9 km east of Burngreave, South Yorkshire, United Kingdom. Its planning application (22/04136/FUL) went to Sheffield on 15 November 2022 and was granted on 5 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 87 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

1 heat detection within 1.5 km of this site on NASA's fire satellites, 11 Nov 2026. A detection is a heat anomaly, not a confirmed fire: a flare, a controlled burn or a neighbouring field can set it off. Members see each detection and are told the day one is made at a site they watch.

Source: NASA FIRMS (LANCE), VIIRS. Read each morning.

LOGICOR LTD (05576366), dissolved, since 2005. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Clipper Logistics, Shepcote Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster28 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof46 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent63 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Logicor
Location
Clipper Logistics 615 Shepcote Lane, South Yorkshire, S9 1RH, United Kingdom
Planning authority
Sheffield
Planning application
22/04136/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/04136/FUL, with what the planning evidence pack adds for this site.

Every application in Sheffield · Alerts for applications and incidents near here

  • 15 November 2022 Planning application submitted
  • 5 January 2023 Planning permission granted
  • 5 January 2026 Planning permission expired

None found. The register holds no published incident that names Clipper Logistics, Shepcote Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Clipper Logistics, Shepcote Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clipper Logistics, Shepcote Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clipper Logistics, Shepcote Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2023.
Where is Clipper Logistics, Shepcote Lane - Solar Panels?
3.9 km east of Burngreave, South Yorkshire, United Kingdom (postcode S9 1RH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).