Planning pack for this site, £295Other options

Solar · United Kingdom

Melton Enterprise Park, Redcliff Road - Solar Panels

Operator Private Developer

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 8 April 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Melton Enterprise Park, Redcliff Road - Solar Panels is a 0.3 MW solar farm in North Ferriby, East Riding of Yorkshire, United Kingdom. Its planning application (25/03552/PVNOT) went to East Riding of Yorkshire on 18 December 2025 and was granted on 6 February 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Melton Enterprise Park, Redcliff Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster41 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton50 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof79 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
Browns Books 5 Melton Enterprise Park Redcliff Road Melton, East Riding of Yorkshire, HU14 3RS, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
25/03552/PVNOT

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/03552/PVNOT, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 18 December 2025 Planning application submitted
  • 6 February 2026 Planning permission granted

None found. The register holds no published incident that names Melton Enterprise Park, Redcliff Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Melton Enterprise Park, Redcliff Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Melton Enterprise Park, Redcliff Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Melton Enterprise Park, Redcliff Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2026.
Where is Melton Enterprise Park, Redcliff Road - Solar Panels?
In North Ferriby, East Riding of Yorkshire, United Kingdom (postcode HU14 3RS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).