Onshore wind · United Kingdom
Melton Common Wind Cluster
Operator Seneca Global Energy
Operational5 MWData checked 16 November 2026Source record dated 8 September 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Melton Common Wind Cluster is a 5 MW wind farm on the edge of North Ferriby, Humberside, United Kingdom. Its planning application (13/01806/STPLFE) went to East Riding of Yorkshire on 14 June 2013 and was granted on 19 December 2013. It has been operating since 1 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Melton Common Wind Cluster changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
SENECA GLOBAL ENERGY LIMITED (07897445), active, since 2012. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Seneca Global Energy
- Location
- Land South West Of Melton Waste Park Gibson Lane South Melton, Humberside, HU14 3LH, United Kingdom
- Planning authority
- East Riding of Yorkshire
- Planning application
- 13/01806/STPLFE
- First operating
- 2017
- Turbines
- 2, 119 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/01806/STPLFE, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 14 June 2013 Planning application submitted
- 19 December 2013 Planning permission granted
- 1 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Melton Common Wind Cluster. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Melton Common Wind Cluster had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Melton Common Wind Cluster; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Melton Common Wind Cluster?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 September 2023.
- Where is Melton Common Wind Cluster?
- On the edge of North Ferriby, Humberside, United Kingdom (postcode HU14 3LH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).