← Back to Wiltshire

Solar · United Kingdom

Marsh Farm Hilperton

Operator Foresight

Operational9.1 MWData checked 16 November 2026Source record dated 4 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Marsh Farm Hilperton is a 9.1 MW solar farm 3 km north-east of Trowbridge, Wiltshire, United Kingdom. Its planning application (14/00592/FUL) went to Wiltshire on 29 January 2014 and was granted on 30 April 2014. It has been operating since 14 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 62 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 22 other sites and 468 energy sites within 40 km for Marsh Farm Hilperton

Members see the sites and incidents around this one, and every record behind them.

FORESIGHT LIMITED (01845521), active, since 1984. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
9.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Foresight
Location
Land North Of Marsh Farm Marsh Road Hilperton Marsh Wiltshire, Wiltshire, BA14 7PJ, United Kingdom
Planning authority
Wiltshire
Planning application
14/00592/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00592/FUL, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 29 January 2014 Planning application submitted
  • 30 April 2014 Planning permission granted
  • 1 December 2014 Construction started
  • 14 March 2015 Operational

None found. The register holds no published incident that names Marsh Farm Hilperton. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Marsh Farm Hilperton had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Marsh Farm Hilperton; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Marsh Farm Hilperton?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2018.
Where is Marsh Farm Hilperton?
3 km north-east of Trowbridge, Wiltshire, United Kingdom (postcode BA14 7PJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).