Manor Farm, Laddingford - Solar Farm

Operator BOOM Developments Limited · Owner Photovoltaic Consulting LTD

Application Submitted4.9 MWData checked 16 November 2026Source record dated 14 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Manor Farm, Laddingford - Solar Farm is a 4.9 MW solar farm 4.3 km north-east of Paddock Wood, Kent, United Kingdom. Its planning application (26/500678/FULL) went to Maidstone on 30 March 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 34 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BOOM DEVELOPMENTS LTD (12488646), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Manor Farm, Laddingford - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London41 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel42 kmSignificant
EIR-15122024Solar panels involved in fire at school in Carshalton44 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
4.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
BOOM Developments Limited
Owner
Photovoltaic Consulting LTD
Location
Manor Farm, Laddingford, Maidstone, Kent, ME18 6BX, United Kingdom
Planning authority
Maidstone
Planning application
26/500678/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/500678/FULL, with what the planning evidence pack adds for this site.

Every application in Maidstone · Alerts for applications and incidents near here

  • 30 March 2026 Planning application submitted

None found. The register holds no published incident that names Manor Farm, Laddingford - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Manor Farm, Laddingford - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Manor Farm, Laddingford - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Manor Farm, Laddingford - Solar Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 14 May 2026.
Where is Manor Farm, Laddingford - Solar Farm?
4.3 km north-east of Paddock Wood, Kent, United Kingdom (postcode ME18 6BX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).