Solar · United Kingdom

Fenwick Solar Farm & Battery Storage

Operator Boom Developments Limited · Owner Photovoltaic Consulting LTD

Awaiting Construction238 MWData checked 16 November 2026Source record dated 3 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Fenwick Solar Farm & Battery Storage is a 238 MW solar farm on the edge of Kirk Sandall, South Yorkshire, United Kingdom. Its planning application (EN010152) went to The Planning Inspectorate - National Infrastructure on 1 November 2024 and was granted on 18 February 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 49 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BOOM DEVELOPMENTS LTD (12488646), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fenwick Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 51 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells51 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool123 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire215 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
238 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Boom Developments Limited
Owner
Photovoltaic Consulting LTD
Location
Thorpe Marsh Substation, Barnby Dun, Doncaster, South Yorkshire, DN3 1ET, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010152

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010152, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 1 November 2024 Planning application submitted
  • 18 February 2026 Planning permission granted
  • 18 February 2031 Planning permission runs out

None found. The register holds no published incident that names Fenwick Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Fenwick Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fenwick Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fenwick Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 March 2026.
Where is Fenwick Solar Farm & Battery Storage?
On the edge of Kirk Sandall, South Yorkshire, United Kingdom (postcode DN3 1ET).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).