← Back to West Sussex

Solar · United Kingdom

Majors Hill/Turners Hill Solar Farm

Operator Haymaker Energy

Operational1.1 MWData checked 16 November 2026Source record dated 15 June 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Majors Hill/Turners Hill Solar Farm is a 1.1 MW solar farm 3.1 km east of Maidenbower, West Sussex, United Kingdom. Its planning application (DM/15/1949) went to Mid Sussex on 15 June 2015 and was granted on 2 October 2015. It has been operating since 15 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 339 energy sites within 40 km for Majors Hill/Turners Hill Solar Farm

Members see the sites and incidents around this one, and every record behind them.

HAYMAKER ENERGY LIMITED (08400512), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Haymaker Energy
Location
Land Parcel At 532484 136274 M, Turners Hill Road, Crawley Down, Crawley, West Sussex, RH10 4, United Kingdom
Planning authority
Mid Sussex
Planning application
DM/15/1949
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/15/1949, with what the planning evidence pack adds for this site.

Every application in Mid Sussex · Alerts for applications and incidents near here

  • 15 June 2015 Planning application submitted
  • 2 October 2015 Planning permission granted
  • 8 January 2016 Construction started
  • 15 March 2016 Operational

None found. The register holds no published incident that names Majors Hill/Turners Hill Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Majors Hill/Turners Hill Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Majors Hill/Turners Hill Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Majors Hill/Turners Hill Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2016.
Where is Majors Hill/Turners Hill Solar Farm?
3.1 km east of Maidenbower, West Sussex, United Kingdom (postcode RH10 4).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).