Solar · United Kingdom

Maes Bach Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational4.9 MWData checked 16 November 2026Source record dated 22 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Maes Bach Farm is a 4.9 MW solar farm 3.9 km south-west of Abertridwr, Mid Glamorgan, United Kingdom. Its planning application (14/1014/10) went to Rhondda Cynon Taf on 31 July 2014 and was granted on 30 December 2014. It has been operating since 19 November 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 38 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 401 energy sites within 40 km for Maes Bach Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Maes Bach, Willowford Road, Tonte, Pontypridd, Mid Glamorgan, Mid Glamorgan, CF38 1SL, United Kingdom
Planning authority
Rhondda Cynon Taf
Planning application
14/1014/10
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/1014/10, with what the planning evidence pack adds for this site.

Every application in Rhondda Cynon Taf · Alerts for applications and incidents near here

  • 31 July 2014 Planning application submitted
  • 30 December 2014 Planning permission granted
  • 16 September 2015 Construction started
  • 19 November 2015 Operational

None found. The register holds no published incident that names Maes Bach Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Maes Bach Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maes Bach Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Maes Bach Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 December 2015.
Where is Maes Bach Farm?
3.9 km south-west of Abertridwr, Mid Glamorgan, United Kingdom (postcode CF38 1SL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).