Solar · United Kingdom
Maes Mawr Solar
Operator Elgin Energy EsCo Ltd
Under Construction30 MWData checked 16 November 2026Source record dated 10 July 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Maes Mawr Solar is a 30 MW solar farm 4 km south-west of Abertridwr, Glamorgan, United Kingdom. Its planning application (DNS/3282038) went to Welsh Government (NSIP) on 1 December 2022 and was granted on 21 December 2023. Construction started on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 39 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Maes Mawr Solar changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Maes Mawr Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 43 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 43 km | Minor |
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 51 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 51 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Elgin Energy EsCo Ltd
- Location
- Farmland between Church Village and Treforest Industrial Est, Church Village bypass (A473), Glamorgan, CF38 1SL, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- DNS/3282038
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DNS/3282038, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 1 December 2022 Planning application submitted
- 21 December 2023 Planning permission granted
- 1 June 2026 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Maes Mawr Solar. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Maes Mawr Solar had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Maes Mawr Solar; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Maes Mawr Solar?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2026.
- Where is Maes Mawr Solar?
- 4 km south-west of Abertridwr, Glamorgan, United Kingdom (postcode CF38 1SL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).