Solar · United Kingdom

Land to the south of Hill Farm

Operator TGC Renewables

Operational6.8 MWData checked 16 November 2026Source record dated 20 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land to the south of Hill Farm is a 6.8 MW solar farm 6.3 km west of Hardingstone, Northamptonshire, United Kingdom. Its planning application (S/2015/2469/MAF) went to West Northamptonshire on 22 October 2015 and was granted on 14 January 2016. It has been operating since 31 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 29 other sites and 581 energy sites within 40 km for Land to the south of Hill Farm

Members see the sites and incidents around this one, and every record behind them.

TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
TGC Renewables
Location
Land to the south of Hill Farm, Gayton Road, Kislingbury, Northamptonshire, United Kingdom
Planning authority
West Northamptonshire
Planning application
S/2015/2469/MAF
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/2015/2469/MAF, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 22 October 2015 Planning application submitted
  • 14 January 2016 Planning permission granted
  • 12 December 2016 Construction started
  • 31 March 2017 Operational

None found. The register holds no published incident that names Land to the south of Hill Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land to the south of Hill Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land to the south of Hill Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land to the south of Hill Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 April 2017.
Where is Land to the south of Hill Farm?
6.3 km west of Hardingstone, Northamptonshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).