← Back to Gwent

Solar · United Kingdom

Land to North West of Lodge Farm (Park Farm)

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational4 MWData checked 16 November 2026Source record dated 26 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land to North West of Lodge Farm (Park Farm) is a 4 MW solar farm on the edge of Caerleon, Gwent, United Kingdom. Its planning application (15/0902) went to Newport on 23 July 2015 and was granted on 8 February 2016. It has been operating since 3 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 507 energy sites within 40 km for Land to North West of Lodge Farm (Park Farm)

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land To North West Of Lodge Fa, Lodge Hill, Caerleon, Gwent, NP18 3BX, United Kingdom
Planning authority
Newport
Planning application
15/0902
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0902, with what the planning evidence pack adds for this site.

Every application in Newport · Alerts for applications and incidents near here

  • 23 July 2015 Planning application submitted
  • 8 February 2016 Planning permission granted
  • 5 December 2016 Construction started
  • 3 March 2017 Operational

None found. The register holds no published incident that names Land to North West of Lodge Farm (Park Farm). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land to North West of Lodge Farm (Park Farm) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land to North West of Lodge Farm (Park Farm); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land to North West of Lodge Farm (Park Farm)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 May 2017.
Where is Land to North West of Lodge Farm (Park Farm)?
On the edge of Caerleon, Gwent, United Kingdom (postcode NP18 3BX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).