Solar · United Kingdom
Eastern Site
Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited
Application Refused5 MWData checked 16 November 2026Source record dated 4 March 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Eastern Site is a 5 MW solar farm on the edge of Caerleon, Gwent, United Kingdom. Its planning application (15/0903) went to Newport on 22 July 2015 and was refused on 8 February 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 49 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Eastern Site changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Lightsource Renewable Energy
- Owner
- Lightsource Holdings 3 Limited
- Location
- Land to NW of Lodge Farm, Lodge Hill, Caerleon, Gwent, NP18 3DL, United Kingdom
- Planning authority
- Newport
- Planning application
- 15/0903
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/0903, with what the planning evidence pack adds for this site.
Every application in Newport · Alerts for applications and incidents near here
Timeline
- 22 July 2015 Planning application submitted
- 8 February 2016 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Eastern Site. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Eastern Site had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Eastern Site; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Eastern Site?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2015.
- Where is Eastern Site?
- On the edge of Caerleon, Gwent, United Kingdom (postcode NP18 3DL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).