← Back to Bedfordshire

Solar · United Kingdom

Land North of Chiltern Greeen

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 20 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land North of Chiltern Greeen is a 5 MW solar farm 4.9 km south-east of Luton, Bedfordshire, United Kingdom. Its planning application (CB/15/01204/FULL) went to Central Bedfordshire on 27 March 2015 and was granted on 26 June 2015. It has been operating since 10 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 27 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 735 energy sites within 40 km for Land North of Chiltern Greeen

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land North of Chiltern Green F, Lawrence End Park North Herts, Chiltern Green, Luton, Bedfordshire, Bedfordshire, LU2 9PN, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/15/01204/FULL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/15/01204/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 27 March 2015 Planning application submitted
  • 26 June 2015 Planning permission granted
  • 10 January 2016 Construction started
  • 10 March 2016 Operational

None found. The register holds no published incident that names Land North of Chiltern Greeen. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land North of Chiltern Greeen had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land North of Chiltern Greeen; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land North of Chiltern Greeen?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2016.
Where is Land North of Chiltern Greeen?
4.9 km south-east of Luton, Bedfordshire, United Kingdom (postcode LU2 9PN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).