← Back to Bedfordshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Wandon End - Solar Farm & Battery Storage

Operator EPL 002 Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 29 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wandon End - Solar Farm & Battery Storage is a 49.9 MW solar farm 4.9 km east of Luton, Bedfordshire, United Kingdom. Its planning application (22/03231/FP) went to North Hertfordshire on 5 January 2023 and was granted on appeal on 15 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 44 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wandon End - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 70 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction70 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire110 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells146 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
EPL 002 Limited
Location
Ne/O Wandon End, Luton, Bedfordshire, LU2 8PU, United Kingdom
Planning authority
North Hertfordshire
Planning application
22/03231/FP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/03231/FP, with what the planning evidence pack adds for this site.

Every application in North Hertfordshire · Alerts for applications and incidents near here

  • 5 January 2023 Planning application submitted
  • 15 July 2025 Planning permission granted
  • 15 July 2025 Appeal granted
  • 15 July 2028 Planning permission runs out

None found. The register holds no published incident that names Wandon End - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Wandon End - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wandon End - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wandon End - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2025.
Where is Wandon End - Solar Farm & Battery Storage?
4.9 km east of Luton, Bedfordshire, United Kingdom (postcode LU2 8PU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).