Solar · United Kingdom

Land at Stripe Farm

Operator Gresham House

Operational5 MWData checked 16 November 2026Source record dated 4 June 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Stripe Farm is a 5 MW solar farm on the edge of Richmond, North Yorkshire, United Kingdom. Its planning application (15/00449/FULL) went to North Yorkshire on 16 June 2015 and was granted on 14 September 2015. It has been operating since 28 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 11 other sites and 220 energy sites within 40 km for Land at Stripe Farm

Members see the sites and incidents around this one, and every record behind them.

GRESHAM HOUSE LIMITED (00000871), active, since 1857. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Gresham House
Location
Land West Of East Appleton Hal, East Appleton, Richmond, North Yorkshire, North Yorkshire, DL10 7QE, United Kingdom
Planning authority
North Yorkshire
Planning application
15/00449/FULL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00449/FULL, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 16 June 2015 Planning application submitted
  • 14 September 2015 Planning permission granted
  • 15 January 2016 Construction started
  • 28 March 2016 Operational

None found. The register holds no published incident that names Land at Stripe Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Stripe Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Stripe Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Stripe Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2018.
Where is Land at Stripe Farm?
On the edge of Richmond, North Yorkshire, United Kingdom (postcode DL10 7QE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).