Solar · United Kingdom
Darlington Road, Skeeby
Operator Atrato Onsite Energy & Harmony Energy · Owner Engie Power Limited
Operational55 MWData checked 16 November 2026Source record dated 11 November 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Darlington Road, Skeeby is a 55 MW solar farm on the edge of Richmond, North Yorkshire, United Kingdom. Its planning application (21/00931/FULL) went to North Yorkshire on 18 October 2021 and was granted on 15 November 2022. It has been operating since 24 October 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Darlington Road, Skeeby changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
ENGIE POWER LIMITED (04236804), active, since 2001. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 55 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Atrato Onsite Energy & Harmony Energy
- Owner
- Engie Power Limited
- Location
- Land South East Of A6108, Darlington Road, Richmond, North Yorkshire, North Yorkshire, DL10 7ED, United Kingdom
- Planning authority
- North Yorkshire
- Planning application
- 21/00931/FULL
- First operating
- 2024
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/00931/FULL, with what the planning evidence pack adds for this site.
Every application in North Yorkshire · Alerts for applications and incidents near here
Timeline
- 18 October 2021 Planning application submitted
- 15 November 2022 Planning permission granted
- 1 April 2023 Construction started
- 24 October 2024 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Darlington Road, Skeeby. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Darlington Road, Skeeby had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Darlington Road, Skeeby; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Darlington Road, Skeeby?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2024.
- Where is Darlington Road, Skeeby?
- On the edge of Richmond, North Yorkshire, United Kingdom (postcode DL10 7ED).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).