Land At Rymes Farm (Phase 1) is a 6.9 MW solar farm 11 km north-west of Gloucester, United Kingdom. Its planning application (P1977/14/FUL) went to Forest of Dean on 23 December 2014 and was granted on 12 June 2015. It has been operating since 31 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 29 other sites and 320 energy sites within 40 km for Land At Rymes Farm (Phase 1)

Members see the sites and incidents around this one, and every record behind them.

TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
TGC Renewables
Location
Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF, United Kingdom
Planning authority
Forest of Dean
Planning application
P1977/14/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P1977/14/FUL, with what the planning evidence pack adds for this site.

Every application in Forest of Dean · Alerts for applications and incidents near here

  • 23 December 2014 Planning application submitted
  • 12 June 2015 Planning permission granted
  • 5 January 2016 Construction started
  • 31 March 2016 Operational

None found. The register holds no published incident that names Land At Rymes Farm (Phase 1). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land At Rymes Farm (Phase 1) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land At Rymes Farm (Phase 1); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land At Rymes Farm (Phase 1)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2016.
Where is Land At Rymes Farm (Phase 1)?
11 km north-west of Gloucester, United Kingdom (postcode GL18 1HF).