Solar · United Kingdom
Land At Rymes Farm (Phase 1)
Operator TGC Renewables
Operational6.9 MWData checked 16 November 2026Source record dated 28 July 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land At Rymes Farm (Phase 1) is a 6.9 MW solar farm 11 km north-west of Gloucester, United Kingdom. Its planning application (P1977/14/FUL) went to Forest of Dean on 23 December 2014 and was granted on 12 June 2015. It has been operating since 31 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land At Rymes Farm (Phase 1) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 6.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- TGC Renewables
- Location
- Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF, United Kingdom
- Planning authority
- Forest of Dean
- Planning application
- P1977/14/FUL
- First operating
- 2016
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P1977/14/FUL, with what the planning evidence pack adds for this site.
Every application in Forest of Dean · Alerts for applications and incidents near here
Timeline
- 23 December 2014 Planning application submitted
- 12 June 2015 Planning permission granted
- 5 January 2016 Construction started
- 31 March 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Land At Rymes Farm (Phase 1). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land At Rymes Farm (Phase 1) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land At Rymes Farm (Phase 1); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land At Rymes Farm (Phase 1)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2016.
- Where is Land At Rymes Farm (Phase 1)?
- 11 km north-west of Gloucester, United Kingdom (postcode GL18 1HF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).