← Back to Dorset

Solar · United Kingdom

Land at Newlands Farm

Operator British Solar Renewables · Owner Owl Investment Bidco Limited

Operational5 MWData checked 16 November 2026Source record dated 14 April 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Newlands Farm is a 5 MW solar farm on the edge of Weymouth, Dorset, United Kingdom. Its planning application (WD/D/14/002675) went to Dorset on 13 October 2014 and was granted on 17 December 2014. It has been operating since 15 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 61 other sites and 175 energy sites within 40 km for Land at Newlands Farm

Members see the sites and incidents around this one, and every record behind them.

BRITISH SOLAR RENEWABLES LIMITED (07315867), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
British Solar Renewables
Owner
Owl Investment Bidco Limited
Location
Newlands Farm, Chickerell, West Dorset, Dorset, DT3 4BG, United Kingdom
Planning authority
Dorset
Planning application
WD/D/14/002675
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/D/14/002675, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 13 October 2014 Planning application submitted
  • 17 December 2014 Planning permission granted
  • 8 June 2015 Construction started
  • 15 February 2016 Operational

None found. The register holds no published incident that names Land at Newlands Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Newlands Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Newlands Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Newlands Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 April 2016.
Where is Land at Newlands Farm?
On the edge of Weymouth, Dorset, United Kingdom (postcode DT3 4BG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).