← Back to Essex

Solar · United Kingdom

Land Adjacent Claypits Farm (a)

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 24 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land Adjacent Claypits Farm (a) is a 5 MW solar farm 5.4 km north-east of Tiptree, Essex, United Kingdom. Its planning application (150614) went to Colchester on 27 March 2015 and was granted on 30 June 2015. It has been operating since 23 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 343 energy sites within 40 km for Land Adjacent Claypits Farm (a)

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land Adjacent Claypits Farm, Maldon Road, Birch, Colchester, Essex, Essex, CO2 0NU, United Kingdom
Planning authority
Colchester
Planning application
150614
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 150614, with what the planning evidence pack adds for this site.

Every application in Colchester · Alerts for applications and incidents near here

  • 27 March 2015 Planning application submitted
  • 30 June 2015 Planning permission granted
  • 22 October 2015 Construction started
  • 23 December 2015 Operational

None found. The register holds no published incident that names Land Adjacent Claypits Farm (a). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land Adjacent Claypits Farm (a) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land Adjacent Claypits Farm (a); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land Adjacent Claypits Farm (a)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 August 2016.
Where is Land Adjacent Claypits Farm (a)?
5.4 km north-east of Tiptree, Essex, United Kingdom (postcode CO2 0NU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).