Battery storage · United Kingdom
Birch Solar Farm & Battery Storage
Operator Low Carbon Solar Park 22 Limited
OperationalData checked 16 November 2026Source record dated 16 May 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Birch Solar Farm & Battery Storage is a battery storage site 6.4 km north-east of Tiptree, Essex, United Kingdom. Its planning application (222151) went to Colchester on 22 August 2022 and was granted on 20 March 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Birch Solar Farm & Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Co-located with RE)
- Status
- Operational
- Operator or applicant
- Low Carbon Solar Park 22 Limited
- Location
- NW/O Hardys Green, Birch Colchester, Essex, CO2, United Kingdom
- Planning authority
- Colchester
- Planning application
- 222151
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 222151, with what the planning evidence pack adds for this site.
Every application in Colchester · Alerts for applications and incidents near here
Timeline
- 22 August 2022 Planning application submitted
- 20 March 2023 Planning permission granted
- 20 March 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Birch Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Birch Solar Farm & Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Birch Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Birch Solar Farm & Battery Storage?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 May 2023.
- Where is Birch Solar Farm & Battery Storage?
- 6.4 km north-east of Tiptree, Essex, United Kingdom (postcode CO2).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).