← Back to Essex

Solar · United Kingdom

Kentishes Solar Farm

Operator Push Energy& NextEnergy Solar Fund (NESF)

Operational5 MWData checked 16 November 2026Source record dated 18 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kentishes Solar Farm is a 5 MW solar farm 4.6 km north-east of Braintree, Essex, United Kingdom. Its planning application (14/00922/FUL) went to Braintree on 5 November 2014 and was granted on appeal on 8 April 2016. It has been operating since 13 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 374 energy sites within 40 km for Kentishes Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Push Energy& NextEnergy Solar Fund (NESF)
Location
Kentishes Farm, Kentish Farm Road, Stisted, Braintree, Essex, CM77 8BX, United Kingdom
Planning authority
Braintree
Planning application
14/00922/FUL
Appeal reference
APP/Z1510/W/15/3130930
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00922/FUL, with what the planning evidence pack adds for this site.

Every application in Braintree · Alerts for applications and incidents near here

  • 5 November 2014 Planning application submitted
  • 4 February 2015 Planning permission refused
  • 23 September 2015 Appeal lodged
  • 8 April 2016 Planning permission granted
  • 8 April 2016 Appeal granted
  • 13 December 2016 Operational
  • 4 January 2017 Construction started

None found. The register holds no published incident that names Kentishes Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kentishes Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kentishes Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kentishes Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2017.
Where is Kentishes Solar Farm?
4.6 km north-east of Braintree, Essex, United Kingdom (postcode CM77 8BX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).