Solar · United Kingdom

Kentish Farm 2 - Solar Farm

Operator Push Energy · Owner Push Renewco Limited

Awaiting Construction16.5 MWData checked 16 November 2026Source record dated 2 September 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kentish Farm 2 - Solar Farm is a 16.5 MW solar farm 4.6 km north-east of Braintree, Essex, United Kingdom. Its planning application (25/01553/FUL) went to Braintree on 10 July 2025 and was granted on 3 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 36 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PUSH ENERGY LIMITED (11963582), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kentish Farm 2 - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2223, Homeowners allege solar panel fault caused Tolleshunt Knights house fire, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire18 kmMajor
EIR-25892022Rooftop solar panels reported to have overheated and sparked fire at Colchester church20 kmSignificant
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers30 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
16.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Push Energy
Owner
Push Renewco Limited
Location
Kentishes Farm, Kentish Farm Road, Stisted, Braintree, Essex, CM77 8BX, United Kingdom
Planning authority
Braintree
Planning application
25/01553/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01553/FUL, with what the planning evidence pack adds for this site.

Every application in Braintree · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 10 July 2025 Planning application submitted
  • 3 July 2026 Planning permission granted
  • 3 July 2029 Planning permission runs out

None found. The register holds no published incident that names Kentish Farm 2 - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Kentish Farm 2 - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kentish Farm 2 - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kentish Farm 2 - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Kentish Farm 2 - Solar Farm?
4.6 km north-east of Braintree, Essex, United Kingdom (postcode CM77 8BX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).