Onshore wind · United Kingdom

Junction House

Operator British Telecom

Application Refused2.3 MWData checked 16 November 2026Source record dated 24 October 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Junction House is a 2.3 MW wind farm on the edge of Easington, County Durham, United Kingdom. Its planning application (PL/5/2010/0473) went to County Durham on 9 February 2011 and was refused on 4 October 2011. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 56 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 496 energy sites within 40 km for Junction House

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
British Telecom
Location
Land North of Pesspool Lane, Easington Village, County Durham, United Kingdom
Planning authority
County Durham
Planning application
PL/5/2010/0473
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/5/2010/0473, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 9 February 2011 Planning application submitted
  • 4 October 2011 Planning permission refused

None found. The register holds no published incident that names Junction House. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Junction House had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Junction House; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Junction House?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 24 October 2011.
Where is Junction House?
On the edge of Easington, County Durham, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).