Planning pack for this site, £295Other options

Solar · United Kingdom

Hackworth Road, North West Industrial Estate - Solar Panels

Operator ABEI Energy Green IX Limited

Application Submitted15.4 MWData checked 16 November 2026Source record dated 5 September 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hackworth Road, North West Industrial Estate - Solar Panels is a 15.4 MW solar farm on the edge of Easington, County Durham, United Kingdom. Its planning application (DM/25/02042/FPA) went to County Durham on 31 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 62 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hackworth Road, North West Industrial Estate - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre21 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland38 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School38 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
15.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
ABEI Energy Green IX Limited
Location
North Of Hackworth Road North West Industrial Estate, County Durham, SR8 2JQ, United Kingdom
Planning authority
County Durham
Planning application
DM/25/02042/FPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/25/02042/FPA, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 31 July 2025 Planning application submitted

None found. The register holds no published incident that names Hackworth Road, North West Industrial Estate - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Hackworth Road, North West Industrial Estate - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hackworth Road, North West Industrial Estate - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hackworth Road, North West Industrial Estate - Solar Panels?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 5 September 2025.
Where is Hackworth Road, North West Industrial Estate - Solar Panels?
On the edge of Easington, County Durham, United Kingdom (postcode SR8 2JQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).