Planning pack for this site, £295Other options

Solar · United Kingdom

B H K UK Davy Drive - Solar Panels

Operator BHK (UK) Limited

Under Construction1.3 MWData checked 16 November 2026Source record dated 11 April 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

B H K UK Davy Drive - Solar Panels is a 1.3 MW solar farm on the edge of Easington, County Durham, United Kingdom. Its planning application (DM/22/00800/FPA) went to County Durham on 30 March 2022 and was granted on 4 July 2022. Construction started on 28 October 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 60 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for B H K UK Davy Drive - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre21 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland38 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School38 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
BHK (UK) Limited
Location
B H K (UK) Davy Drive North West Industrial Estate Peterlee, County Durham, SR8 2JF, United Kingdom
Planning authority
County Durham
Planning application
DM/22/00800/FPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/22/00800/FPA, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 30 March 2022 Planning application submitted
  • 4 July 2022 Planning permission granted
  • 28 October 2022 Construction started

None found. The register holds no published incident that names B H K UK Davy Drive - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has B H K UK Davy Drive - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names B H K UK Davy Drive - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of B H K UK Davy Drive - Solar Panels?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2022.
Where is B H K UK Davy Drive - Solar Panels?
On the edge of Easington, County Durham, United Kingdom (postcode SR8 2JF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).