Battery storage · United Kingdom

Carrs Farm, South Hetton - Battery Energy Storage System

Operator Stephenson Halliday

Planning Permission Refused200 MWData checked 16 November 2026Source record dated 4 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Carrs Farm, South Hetton - Battery Energy Storage System is a 200 MW battery storage site on the edge of Murton, County Durham, United Kingdom. Its planning application (DM/25/01345/FPA) went to County Durham on 21 May 2025 and was refused on 9 July 2026. Its status in the Renewable Energy Planning Database (UK government) is planning permission refused. There are 56 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

498 energy sites within 40 km for Carrs Farm, South Hetton - Battery Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
200 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Refused
Operator or applicant
Stephenson Halliday
Location
E/O Carrs Farm, South Hetton, Durham, County Durham, DH6 2RY, United Kingdom
Planning authority
County Durham
Planning application
DM/25/01345/FPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/25/01345/FPA, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

Durham County Council refused this application on 9 July 2026, at the County Planning Committee. The government planning database still showed the application as submitted when we checked on 8 October 2026, so this page uses the council's decision. The council's planning record.

  • 21 May 2025 Planning application submitted
  • 9 July 2026 Planning permission refused

None found. The register holds no published incident that names Carrs Farm, South Hetton - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Carrs Farm, South Hetton - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Carrs Farm, South Hetton - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Carrs Farm, South Hetton - Battery Energy Storage System?
Planning Permission Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 August 2026.
Where is Carrs Farm, South Hetton - Battery Energy Storage System?
On the edge of Murton, County Durham, United Kingdom (postcode DH6 2RY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).