Carrs Farm, South Hetton - Battery Energy Storage System
Operator Stephenson Halliday
Planning Permission Refused200 MWData checked 16 November 2026Source record dated 4 August 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Carrs Farm, South Hetton - Battery Energy Storage System is a 200 MW battery storage site on the edge of Murton, County Durham, United Kingdom. Its planning application (DM/25/01345/FPA) went to County Durham on 21 May 2025 and was refused on 9 July 2026. Its status in the Renewable Energy Planning Database (UK government) is planning permission refused. There are 56 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Carrs Farm, South Hetton - Battery Energy Storage System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 200 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Refused
- Operator or applicant
- Stephenson Halliday
- Location
- E/O Carrs Farm, South Hetton, Durham, County Durham, DH6 2RY, United Kingdom
- Planning authority
- County Durham
- Planning application
- DM/25/01345/FPA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DM/25/01345/FPA, with what the planning evidence pack adds for this site.
Every application in County Durham · Alerts for applications and incidents near here
Durham County Council refused this application on 9 July 2026, at the County Planning Committee. The government planning database still showed the application as submitted when we checked on 8 October 2026, so this page uses the council's decision. The council's planning record.
Timeline
- 21 May 2025 Planning application submitted
- 9 July 2026 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Carrs Farm, South Hetton - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Carrs Farm, South Hetton - Battery Energy Storage System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Carrs Farm, South Hetton - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Carrs Farm, South Hetton - Battery Energy Storage System?
- Planning Permission Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 August 2026.
- Where is Carrs Farm, South Hetton - Battery Energy Storage System?
- On the edge of Murton, County Durham, United Kingdom (postcode DH6 2RY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).