← Back to Warwickshire

Solar · United Kingdom

Horiba Mira, Mira Drive - Solar Array

Operator Motor Industry Research Association

Operational7 MWData checked 16 November 2026Source record dated 18 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Horiba Mira, Mira Drive - Solar Array is a 7 MW solar farm 3.5 km north of Nuneaton, Warwickshire, United Kingdom. Its planning application (22/00941/FUL) went to Hinckley and Bosworth on 29 September 2022 and was granted on 10 February 2023. It has been operating since 1 September 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

693 energy sites within 40 km for Horiba Mira, Mira Drive - Solar Array

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Motor Industry Research Association
Location
Horiba Mira Ltd Mira Drive Lindley, Warwickshire, CV10 0TT, United Kingdom
Planning authority
Hinckley and Bosworth
Planning application
22/00941/FUL
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00941/FUL, with what the planning evidence pack adds for this site.

Every application in Hinckley and Bosworth · Alerts for applications and incidents near here

  • 29 September 2022 Planning application submitted
  • 10 February 2023 Planning permission granted
  • 1 September 2025 Operational

None found. The register holds no published incident that names Horiba Mira, Mira Drive - Solar Array. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Horiba Mira, Mira Drive - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Horiba Mira, Mira Drive - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Horiba Mira, Mira Drive - Solar Array?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 May 2026.
Where is Horiba Mira, Mira Drive - Solar Array?
3.5 km north of Nuneaton, Warwickshire, United Kingdom (postcode CV10 0TT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).