Solar · United Kingdom
Triumph Motorcycles, Normandy Way - Solar PV Array
Operator Triumph Motorcycles Limited
Awaiting Construction1.3 MWData checked 16 November 2026Source record dated 10 November 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Triumph Motorcycles, Normandy Way - Solar PV Array is a 1.3 MW solar farm on the edge of Hinckley, Leicestershire, United Kingdom. Its planning application (23/00755/FUL) went to Hinckley and Bosworth on 2 August 2023 and was granted on 1 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Triumph Motorcycles, Normandy Way - Solar PV Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Triumph Motorcycles, Normandy Way - Solar PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 26 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2151 | 2018 | Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge | 26 km | Significant |
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 31 km | Minor |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 32 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Triumph Motorcycles Limited
- Location
- Triumph Motorcycles Limited, Normandy Way, Hinckley, Leicestershire, LE10 3BZ, United Kingdom
- Planning authority
- Hinckley and Bosworth
- Planning application
- 23/00755/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00755/FUL, with what the planning evidence pack adds for this site.
Every application in Hinckley and Bosworth · Alerts for applications and incidents near here
Timeline
- 2 August 2023 Planning application submitted
- 1 November 2023 Planning permission granted
- 1 November 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Triumph Motorcycles, Normandy Way - Solar PV Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Triumph Motorcycles, Normandy Way - Solar PV Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Triumph Motorcycles, Normandy Way - Solar PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Triumph Motorcycles, Normandy Way - Solar PV Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 November 2023.
- Where is Triumph Motorcycles, Normandy Way - Solar PV Array?
- On the edge of Hinckley, Leicestershire, United Kingdom (postcode LE10 3BZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).