Planning pack for this site, £295Other options

Solar · United Kingdom

Dpd International Gateway, Logix Road Phase 1 - Solar Panels

Operator DBD Group UK Limited

Awaiting Construction0.8 MWData checked 16 November 2026Source record dated 25 October 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dpd International Gateway, Logix Road Phase 1 - Solar Panels is a 0.8 MW solar farm in Hinckley, Leicestershire, United Kingdom. Its planning application (23/00832/FUL) went to Hinckley and Bosworth on 25 August 2023 and was granted on 19 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dpd International Gateway, Logix Road Phase 1 - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge26 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property30 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college32 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
DBD Group UK Limited
Location
Dpd International Gateway, Logix Road, Hinckley, Leicestershire, LE10 3BQ, United Kingdom
Planning authority
Hinckley and Bosworth
Planning application
23/00832/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00832/FUL, with what the planning evidence pack adds for this site.

Every application in Hinckley and Bosworth · Alerts for applications and incidents near here

  • 25 August 2023 Planning application submitted
  • 19 October 2023 Planning permission granted
  • 19 October 2026 Planning permission expired

None found. The register holds no published incident that names Dpd International Gateway, Logix Road Phase 1 - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Dpd International Gateway, Logix Road Phase 1 - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dpd International Gateway, Logix Road Phase 1 - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dpd International Gateway, Logix Road Phase 1 - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 October 2023.
Where is Dpd International Gateway, Logix Road Phase 1 - Solar Panels?
In Hinckley, Leicestershire, United Kingdom (postcode LE10 3BQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).