← Back to Co. Antrim

Solar · United Kingdom

Hillside Solar Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational25.2 MWData checked 16 November 2026Source record dated 28 July 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hillside Solar Farm is a 25.2 MW solar farm 7 km south of Crumlin, Co. Antrim, United Kingdom. Its planning application (LA05/2015/0305/F) went to Lisburn and Castlereagh on 30 June 2015 and was granted on 19 May 2016. It has been operating since 15 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 169 energy sites within 40 km for Hillside Solar Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
25.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Lds Approximately 180m S Of, 7a Lough Road, Ballinderry Upper, Lisburn, Co Antrim, Co. Antrim, BT28 2PQ, United Kingdom
Planning authority
Lisburn and Castlereagh
Planning application
LA05/2015/0305/F
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA05/2015/0305/F, with what the planning evidence pack adds for this site.

Every application in Lisburn and Castlereagh · Alerts for applications and incidents near here

  • 30 June 2015 Planning application submitted
  • 19 May 2016 Planning permission granted
  • 15 February 2017 Construction started
  • 15 March 2017 Operational

None found. The register holds no published incident that names Hillside Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hillside Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hillside Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hillside Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2017.
Where is Hillside Solar Farm?
7 km south of Crumlin, Co. Antrim, United Kingdom (postcode BT28 2PQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).