Battery storage · United Kingdom
Battery Storage System Development in Lisburn
Operator Lisburn Energy Limited
Awaiting Construction150 MWData checked 16 November 2026Source record dated 24 February 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Battery Storage System Development in Lisburn is a 150 MW battery storage site 5.2 km west of Lisburn, Co. Lisburn & Castlereagh, United Kingdom. Its planning application (LA05/2024/0401/F) went to Stockton-on-Tees on 30 April 2024 and was granted on 30 January 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Battery Storage System Development in Lisburn changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Battery Storage System Development in Lisburn sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 244 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 244 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 363 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 419 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 150 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Lisburn Energy Limited
- Location
- On Lands Approximately 230m East of No 2 Moneybroom Road, Lisburn, Co. Lisburn & Castlereagh, BT28 2QP, United Kingdom
- Planning authority
- Stockton-on-Tees
- Planning application
- LA05/2024/0401/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA05/2024/0401/F, with what the planning evidence pack adds for this site.
Every application in Stockton-on-Tees · Alerts for applications and incidents near here
Timeline
- 30 April 2024 Planning application submitted
- 30 January 2026 Planning permission granted
- 28 January 2031 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Battery Storage System Development in Lisburn. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Battery Storage System Development in Lisburn had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Battery Storage System Development in Lisburn; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Battery Storage System Development in Lisburn?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2026.
- Where is Battery Storage System Development in Lisburn?
- 5.2 km west of Lisburn, Co. Lisburn & Castlereagh, United Kingdom (postcode BT28 2QP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).