Planning pack for this site, £295Other options

Battery storage · United Kingdom

Battery Storage System Development in Lisburn

Operator Lisburn Energy Limited

Awaiting Construction150 MWData checked 16 November 2026Source record dated 24 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Battery Storage System Development in Lisburn is a 150 MW battery storage site 5.2 km west of Lisburn, Co. Lisburn & Castlereagh, United Kingdom. Its planning application (LA05/2024/0401/F) went to Stockton-on-Tees on 30 April 2024 and was granted on 30 January 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Battery Storage System Development in Lisburn sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 244 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool244 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells363 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire419 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
150 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Lisburn Energy Limited
Location
On Lands Approximately 230m East of No 2 Moneybroom Road, Lisburn, Co. Lisburn & Castlereagh, BT28 2QP, United Kingdom
Planning authority
Stockton-on-Tees
Planning application
LA05/2024/0401/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA05/2024/0401/F, with what the planning evidence pack adds for this site.

Every application in Stockton-on-Tees · Alerts for applications and incidents near here

  • 30 April 2024 Planning application submitted
  • 30 January 2026 Planning permission granted
  • 28 January 2031 Planning permission runs out

None found. The register holds no published incident that names Battery Storage System Development in Lisburn. If you know of one, report it (confidential reports are anonymised).

Has Battery Storage System Development in Lisburn had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Battery Storage System Development in Lisburn; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Battery Storage System Development in Lisburn?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2026.
Where is Battery Storage System Development in Lisburn?
5.2 km west of Lisburn, Co. Lisburn & Castlereagh, United Kingdom (postcode BT28 2QP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).