Solar · United Kingdom
Ballinderry Road Solar Phase 2 (Lisburn)
Operator RAD Energy One& Island Green Power
Operational7 MWData checked 16 November 2026Source record dated 18 April 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ballinderry Road Solar Phase 2 (Lisburn) is a 7 MW solar farm 3.6 km west of Lisburn, Co. Antrim, United Kingdom. Its planning application (LA05/2015/0157/F) went to Lisburn and Castlereagh on 19 May 2015 and was granted on 14 October 2015. It has been operating since 20 February 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Ballinderry Road Solar Phase 2 (Lisburn) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 7 MW (this record)
- All phases
- 20.5 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- RAD Energy One& Island Green Power
- Location
- Lands immediately north east o, Moneybroom Road, the junction of Ballinderry Rd, Lisburn, Co. Antrim, BT28 2QP, United Kingdom
- Planning authority
- Lisburn and Castlereagh
- Planning application
- LA05/2015/0157/F
- First operating
- 2017
This record is 7 MW, one part of a site built in phases. With Ballinderry Road Solar Phase 1 (Lisburn) (13.5 MW) the phases on the register add up to 20.5 MW. Ballinderry Road Solar Phase 1 (Lisburn)
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA05/2015/0157/F, with what the planning evidence pack adds for this site.
Every application in Lisburn and Castlereagh · Alerts for applications and incidents near here
Timeline
- 19 May 2015 Planning application submitted
- 14 October 2015 Planning permission granted
- 1 July 2016 Construction started
- 20 February 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Ballinderry Road Solar Phase 2 (Lisburn). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Ballinderry Road Solar Phase 2 (Lisburn) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ballinderry Road Solar Phase 2 (Lisburn); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Ballinderry Road Solar Phase 2 (Lisburn)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2017.
- Where is Ballinderry Road Solar Phase 2 (Lisburn)?
- 3.6 km west of Lisburn, Co. Antrim, United Kingdom (postcode BT28 2QP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).