Solar · United Kingdom
Highnam Solar Farm
Operator Pike Solar
Abandoned5 MWData checked 16 November 2026Source record dated 14 November 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Highnam Solar Farm is a 5 MW solar farm 4.6 km west of Gloucester, United Kingdom. Its planning application (15/00410/FUL) went to Tewkesbury on 16 June 2015 and was granted on appeal on 6 June 2016. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 63 other energy sites within 10 km, 50 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Highnam Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Abandoned
- Operator or applicant
- Pike Solar
- Location
- Land At Highnam Farm, Two Mile Lane, Highnam, Gloucester, Gloucestershire, Gloucestershire, GL2 8DW, United Kingdom
- Planning authority
- Tewkesbury
- Planning application
- 15/00410/FUL
- Appeal reference
- APP/G1630/W/16/3141634
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/00410/FUL, with what the planning evidence pack adds for this site.
Every application in Tewkesbury · Alerts for applications and incidents near here
Timeline
- 16 June 2015 Planning application submitted
- 24 November 2015 Planning permission refused
- 22 January 2016 Appeal lodged
- 6 June 2016 Planning permission granted
- 6 June 2016 Appeal granted
- 6 June 2019 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Highnam Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Highnam Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Highnam Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Highnam Solar Farm?
- Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 14 November 2019.
- Where is Highnam Solar Farm?
- 4.6 km west of Gloucester, United Kingdom (postcode GL2 8DW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).