Solar · United Kingdom

Maisemore - Solar Farm

Operator Renewable Connections Developments Limited · Owner Rivington Energy Limited

Awaiting Construction37 MWData checked 16 November 2026Source record dated 1 June 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Maisemore - Solar Farm is a 37 MW solar farm 3.4 km north-west of Gloucester, United Kingdom. Its planning application (22/00397/FUL) went to Tewkesbury on 19 April 2022 and was granted on 6 March 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 52 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

RENEWABLE CONNECTIONS DEVELOPMENTS LIMITED (12351905), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Maisemore - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries30 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire31 kmSignificant
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home44 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
37 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Renewable Connections Developments Limited
Owner
Rivington Energy Limited
Location
South Of Maisemore, Gloucestershire, GL2 8HH, United Kingdom
Planning authority
Tewkesbury
Planning application
22/00397/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00397/FUL, with what the planning evidence pack adds for this site.

Every application in Tewkesbury · Alerts for applications and incidents near here

  • 19 April 2022 Planning application submitted
  • 6 March 2023 Planning permission granted
  • 6 March 2026 Planning permission expired

None found. The register holds no published incident that names Maisemore - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Maisemore - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maisemore - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Maisemore - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2023.
Where is Maisemore - Solar Farm?
3.4 km north-west of Gloucester, United Kingdom (postcode GL2 8HH).