Solar · United Kingdom

Over Farm

Operator Over Farm Solar

Awaiting Construction9.9 MWData checked 16 November 2026Source record dated 14 November 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Over Farm is a 9.9 MW solar farm on the edge of Gloucester, United Kingdom. Its planning application (15/00409/FUL) went to Tewkesbury on 28 May 2015 and was granted on appeal on 6 June 2016. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 69 other energy sites within 10 km, 55 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Over Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries28 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire30 kmSignificant
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home45 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
9.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Over Farm Solar
Location
Over Farm, Over Bridge, Over, Gloucester, Gloucestershire, GL2 8DB, United Kingdom
Planning authority
Tewkesbury
Planning application
15/00409/FUL
Appeal reference
APP/G1630/W/16/3141824

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00409/FUL, with what the planning evidence pack adds for this site.

Every application in Tewkesbury · Alerts for applications and incidents near here

  • 28 May 2015 Planning application submitted
  • 24 November 2015 Planning permission refused
  • 22 January 2016 Appeal lodged
  • 6 June 2016 Planning permission granted
  • 6 June 2016 Appeal granted
  • 6 June 2019 Planning permission expired

None found. The register holds no published incident that names Over Farm. If you know of one, report it (confidential reports are anonymised).

Has Over Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Over Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Over Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 November 2019.
Where is Over Farm?
On the edge of Gloucester, United Kingdom (postcode GL2 8DB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).