Onshore wind · United Kingdom

High Haswell Wind Farm

Operator Hallam Land Management

Operational4 MWData checked 16 November 2026Source record dated 6 April 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

High Haswell Wind Farm is a 4 MW wind farm 3.5 km south of Hetton-Le-Hole, County Durham, United Kingdom. Its planning application (PLAN/2007/0223) went to County Durham on 3 April 2007 and was granted on 18 December 2007. It has been operating since 10 March 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 61 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

501 energy sites within 40 km for High Haswell Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Hallam Land Management
Location
Colliery Farm, Green Lane, High Haswell, County Durham, United Kingdom
Planning authority
County Durham
Planning application
PLAN/2007/0223
First operating
2011
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PLAN/2007/0223, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 3 April 2007 Planning application submitted
  • 18 December 2007 Planning permission granted
  • 1 January 2011 Construction started
  • 10 March 2011 Operational

None found. The register holds no published incident that names High Haswell Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has High Haswell Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Haswell Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of High Haswell Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 April 2011.
Where is High Haswell Wind Farm?
3.5 km south of Hetton-Le-Hole, County Durham, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).