Solar · United Kingdom
Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage
Operator Hare Hill Solar Limited
Application Refused31.5 MWData checked 16 November 2026Source record dated 25 July 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage is a 31.5 MW solar farm 4.5 km north-west of Wingate, County Durham, United Kingdom. Its planning application (DM/24/03473/FPA) went to County Durham on 24 December 2024 and was refused on 4 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 64 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 31.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Hare Hill Solar Limited
- Location
- Harehill Farm Haswell Plough, County Durham, DH6 2BA, United Kingdom
- Planning authority
- County Durham
- Planning application
- DM/24/03473/FPA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DM/24/03473/FPA, with what the planning evidence pack adds for this site.
Every application in County Durham · Alerts for applications and incidents near here
Timeline
- 24 December 2024 Planning application submitted
- 4 July 2025 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2025.
- Where is Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage?
- 4.5 km north-west of Wingate, County Durham, United Kingdom (postcode DH6 2BA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).