← Back to Shropshire

Solar · United Kingdom

Henley Solar Farm

Operator Greencoat& Renesola

Operational6.5 MWData checked 16 November 2026Source record dated 1 December 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Henley Solar Farm is a 6.5 MW solar farm 14 km north-west of Ludlow, Shropshire, United Kingdom. Its planning application (14/04930/FUL) went to Shropshire on 3 November 2014 and was granted on appeal on 4 January 2016. It has been operating since 29 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

148 energy sites within 40 km for Henley Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Greencoat& Renesola
Location
Land North Of Henley Common Henley Lane Acton Scott, Shropshire, SY6 6RS, United Kingdom
Planning authority
Shropshire
Planning application
14/04930/FUL
Appeal reference
APP/L3245/W/15/3022913
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/04930/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 3 November 2014 Planning application submitted
  • 16 February 2015 Planning permission refused
  • 25 June 2015 Appeal lodged
  • 4 January 2016 Planning permission granted
  • 4 January 2016 Appeal granted
  • 29 December 2016 Construction started
  • 29 March 2017 Operational

None found. The register holds no published incident that names Henley Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Henley Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Henley Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Henley Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 December 2017.
Where is Henley Solar Farm?
14 km north-west of Ludlow, Shropshire, United Kingdom (postcode SY6 6RS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).