← Back to Shropshire

Solar · United Kingdom

Henley Solar Farm

Operator Henley Solar Farm

Application Refused6.5 MWData checked 16 November 2026Source record dated 6 November 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Henley Solar Farm is a 6.5 MW solar farm 14 km north-west of Ludlow, Shropshire, United Kingdom. Its planning application (14/02807/FUL) went to Shropshire on 7 July 2014 and was refused on 27 October 2014. Its status in the Renewable Energy Planning Database (UK government) is application refused. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

148 energy sites within 40 km for Henley Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Henley Solar Farm
Location
Land North of Henley Common, Henley Lane, Acton Scott, Church Stretton, Shropshire, Shropshire, United Kingdom
Planning authority
Shropshire
Planning application
14/02807/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/02807/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 7 July 2014 Planning application submitted
  • 27 October 2014 Planning permission refused

None found. The register holds no published incident that names Henley Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Henley Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Henley Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Henley Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 6 November 2014.
Where is Henley Solar Farm?
14 km north-west of Ludlow, Shropshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).